Charging and Mounting Unit

The charging and mounting unit takes the material from the tunnel boring machine (TBM) and serves as a deflecting station for the tunnel belt.

It contains an assembly station for the belt extension.

Belt frames are being pre-mounted and lifted hydraulically for the assembly.